英语翻译Optimization parametersThe simulation begins with the current planning year.Because of different contractual relationships andagreements there is no option to make an operationalchange of measure quantities in this year.Therefore theoptim

来源:学生作业帮助网 编辑:作业帮 时间:2024/04/29 10:03:12
英语翻译Optimization parametersThe simulation begins with the current planning year.Because of different contractual relationships andagreements there is no option to make an operationalchange of measure quantities in this year.Therefore theoptim

英语翻译Optimization parametersThe simulation begins with the current planning year.Because of different contractual relationships andagreements there is no option to make an operationalchange of measure quantities in this year.Therefore theoptim
英语翻译
Optimization parameters
The simulation begins with the current planning year.
Because of different contractual relationships and
agreements there is no option to make an operational
change of measure quantities in this year.Therefore the
optimization core must not vary the targeted amounts in the
current year.Hence the amounts of the base year are fixed
by a specific parameter setting.The asset simulation includes equipment,which can not be
renewed in the original technology and has to be rebuilt in
newer technology.This equipment must be excluded from
the optimization of the renewal amounts.This leads to an
exact resource related release of the renewal amount
optimization.The conversion is generally allowed for the
optimization in all cases the simulation model permits a
conversion.
The study handles a complete network of a large German
distribution system operator including all active resources
of the voltage levels from 110 kV to 0.4 kV.To find valid
results within such a complex model concerning the
mentioned restrictions and requirements,the search step
sizes of the optimizer must be set large enough.However
they may not be too large otherwise very discontinuous
high and low points of the target value can not be found.

英语翻译Optimization parametersThe simulation begins with the current planning year.Because of different contractual relationships andagreements there is no option to make an operationalchange of measure quantities in this year.Therefore theoptim
优化参数仿真始于当前规划年.因为不同的契约关系和协议是没有选项进行操作变化的措施的数量在这一年.因此优化核心变化必须有针对性的数量在目前的一年.因此,大量的基年是固定的通过一个具体的参数设置.资产包括仿真设备,不可在原有的技术和已被重建新技术.这设备必须被排除优化的更新量.这就导致了一个确切的资源相关的释放量的更新优化.转换通常是允许的在所有情况下的仿真优化模型许可证转换.研究处理网络齐全的大型德国分布系统包括所有活动的资源在电压水平从110伏到0.4伏.找到有效的结果在这样一个复杂的模型分析提到的限制和要求,搜索步骤尺寸的优化必须设置足够大.不过他们可能不会太大,否则不连续高低点的目标值不被发现

全文翻译如下,绝对人工所为并具专业性: 农业出口贸易:贸易技术壁垒 Geoffrey S. Becker Specialist in Agricultural Policy Environment and Natural Resources